How Much Contingency to Keep When Building a House
How much contingency to keep when building a house (10 to 15% of the build cost), what it is for, what it is not for, and how to track it...
How Much Contingency to Keep When Building a House
How much contingency to keep when building a house (10 to 15% of the build cost), what it is for, what it is not for, and how to track it...
How to Budget for Building a House: A Site Mana...
How a construction site manager would budget the build of his own home: cost lines, contingency, quotes, allowances, change orders, payments and a weekly 15-minute routine.
How to Budget for Building a House: A Site Mana...
How a construction site manager would budget the build of his own home: cost lines, contingency, quotes, allowances, change orders, payments and a weekly 15-minute routine.
Running Monthly Cost Control on a FIDIC Contract
Almost everything written about FIDIC is about disputes. This is the operational half: the monthly routine that catches a problem while it is still a cost variance, before it becomes...
Running Monthly Cost Control on a FIDIC Contract
Almost everything written about FIDIC is about disputes. This is the operational half: the monthly routine that catches a problem while it is still a cost variance, before it becomes...
Cost or Cost Plus Profit: What FIDIC Actually L...
FIDIC defines Cost to exclude profit. Some clauses give you Cost, others Cost Plus Profit, and the difference is the whole margin on a claim. Here is how to map...
Cost or Cost Plus Profit: What FIDIC Actually L...
FIDIC defines Cost to exclude profit. Some clauses give you Cost, others Cost Plus Profit, and the difference is the whole margin on a claim. Here is how to map...
The FIDIC Payment Clock: 28 Days, 56 Days and W...
Clause 14 sets out exactly when money moves on a FIDIC job. Read as a cash flow rather than a procedure, it explains why contracts with the right margin still...
The FIDIC Payment Clock: 28 Days, 56 Days and W...
Clause 14 sets out exactly when money moves on a FIDIC job. Read as a cash flow rather than a procedure, it explains why contracts with the right margin still...
Variation Valuation Under FIDIC: The Four Gates...
A quantity moved a long way from the bill, so the rate must change. Not under FIDIC it does not. Sub-clause 12.3 sets four cumulative tests, and the one that...
Variation Valuation Under FIDIC: The Four Gates...
A quantity moved a long way from the bill, so the rate must change. Not under FIDIC it does not. Sub-clause 12.3 sets four cumulative tests, and the one that...